loading

Fox Mold-Professional Injection Molding Manufacturer Provide Customize Service Since 2013.

What precautions/we should do for mold trial? 2-1

Precautions for mold trial - 6 points.

 

1.  During mold changing (mold testing ) processes, technician and worker's personal safety should be taken into consideration and operating procedures should be strictly followed to avoid damage to molds and equipment.

 

2.  The molding cycle time is controlled within the target cycle.

 

3.  If it is a production mold, you need to call up the historical parameter record table for reference.

 

4.  The samples for measurement must be taken when the mold temperature and molding conditions are stable, and after 10 molds of continuous production, the number of samples is molds, and each sampling should be molds apart. Each time the mold is tested, fill in the relevant content according to the requirements of the "Trial Verification Dependency Book" and produce the required number of samples.

 

5.   The mold test technician shall make a preliminary confirmation of the sample appearance and size based on the product drawings provided by the customer.

To shorten the waiting time for measurement, the mold can be blown cold under air conditioning and then cooled naturally for 15 minutes before measurement.

Technicians should be proficient in using measuring instruments to accurately measure products. If there are any problems during the measurement process, they should contact the quality personnel in a timely manner. To reduce repeated mold trials due to measurement errors.

 

6.      When adjusting the robot, prevent the robot chuck from hitting the mold.

 

 

prev
What Precautions/We should do for mold trial? 2-2
Molding Parameter Setting Up Instruction 2-2 l Fox Mold
next
recommended for you
no data
GET IN TOUCH WITH Us
Copyright © 2025 -Fox Mold | Sitemap
Contact us
phone
whatsapp
contact customer service
Contact us
phone
whatsapp
cancel
Customer service
detect