1. When assembling the mold, the mold must be cleaned thoroughly. No iron slag, iron filings or debris should remain on the mold's surrounding surfaces, inside the ejector plate, inside the oil circuit, inside the slide rail, inside the guide pin hole, or on any other part of the mold, as well as on the mold parting surface.
2. After the mold is fittedd, all red lead must be cleaned, and grease must be added to the corresponding active parts;
3. When assembling the mold, ensure that all movable parts such as ejector pins, slide rails, inner needles of the wire tube, ejector plate support, guide pins, lever pins and lock holes are lubricated with grease in the oil tank, and the excess grease in the relevant parts must be cleaned up and no grease should remain in any part of the mold.
4. After assembling the mold, before closing the mold and cleaning the parting surface, the cavity needs to be treated with anti-rust agent ( spray anti-rust agent );
5. After the mold is assembled, the surface of the mold frame needs to be wiped with shredded white cloth to ensure that there is no oil stain or debris on the surface of the mold frame ( so that anti-rust paint can be applied later );
6. For newly made molds, after the mold is assembled, spray colorless anti-rust oil on the surface of the mold frame ( to prevent the mold frame from rusting during the mold trial and confirmation period ).
7. Check whether the electronic reset switch of the mold, the mechanical forced reset mechanism and the lock of the mold are effective and fully configured;
8.The above content includes the assembly and inspection of new molds and molds in production after mold repair ;