loading

Fox Mold-Professional Injection Molding Manufacturer Provide Customize Service Since 2013.

What are project department's job during mold test to maintain the molds?
The molds are very heavy, it is very important to protect it from damage from transfering the mold to test, and moving back to mold storage.

Different departments has different responsability to do on mold maitenance. Please click the topic to see all the maintain management at Fox Mold, you will have confidence that your mold will be kept well here and molding the parts you need.
2024 08 08
What maintenance job need to do during mold fitment?
This mold maintenance management system is specially formulated to ensure the quality of molds, extend the service life of molds, ensure smooth production and effectively protect customer property. Click to know more our mold maintenance in detail.
2024 08 08
What shall we do after mold trail?
There are many jobs need to be done after mold trail, including finish the molding condition record, clean the machine and maintain the mold, send the FAI to measurment lab and etc,. Analyzing the problems existing in the trial production is the most important thing need to be done.
2024 08 08
What Precautions/We should do for mold trial? 2-2
This is the second article we introduce the precautions for mold test, the following points is cover measurment, robot hand adjustment, sample sticking on mold issue solved, shrinkage issue solviing etc.,
2024 08 07
What precautions/we should do for mold trial? 2-1
Mold trail is the final step of mold making, we can molding plastics samples(FAI) by the mold we produced last few weeks.

There are strict precautions for mold trial, in this articles we will introduce the first 6 points.
2024 08 07
Molding Parameter Setting Up Instruction 2-2 l Fox Mold
Here we keep introducing our injection molding parameter instruction in detail.

There are 5 more steps to teach you setting up correct parameter, to produce plastic parts in its good profile and dimensions.
2024 08 07
Molding Parameter Setting Up Instruction 2-1 l Fox Mold
There are many factors we need to consider during setting up the molding parameter before mold trail or mass production. Fox Mold make a very detailed instruction of it. We are introducing part of the instruction in this FAQ.
2024 08 06
Fox Mold Instruction of mold installation on injection machine
What shall we do before and after we installing the mold to injection machine to do a mold test or mass production? We make a detailed and professional instruction of this important part including 8 steps.
2024 08 06
What preparation should do before mold trial?
There are 5 steps, click to know more.
2024 08 06
What is the suitable parameter for different kinds of plastic raw material?
There are many kind of plastic raw material, what is the basic gerneral parameter of injection molding? Need to set up property before mold test or injection molding. We list few common raw material injection molding parameter for your reference.
2024 08 06
no data
recommended for you
no data
Copyright © 2025 -Fox Mold | Sitemap
Contact us
phone
whatsapp
contact customer service
Contact us
phone
whatsapp
cancel
Customer service
detect